| BTS/BSC/MSC | |||||||||||||||||
| Services | |||||||||||||||||
|
|||||||||||||||||
|
|||||||||||||||||
| GSM Antenna Installation | |||||||||||||||||
| The installation of antenna mounting pipes associated with mechanical arrangement will be examined and where necessary corrected to ensure the following: - > Desired Orientation > Desired Height > Grounding > Lighting Protection |
|||||||||||||||||
| Antenna Installation Process | |||||||||||||||||
| The antenna installation will be carried out using the following resources: - > Trained team > Expert supervision > Site Master > E1 Tester > SDH Analyzer |
|||||||||||||||||
| Testing and Commissioning of BTS / MW Equipment | |||||||||||||||||
| SNS undertakes the task of testing and commissioning of telecom equipment on site. It usually involves the following:- DLC (Digital Loop Carrier) Teams have successfully completed the works of DLC to the reputed clients like, Airtel, TATA with UT Starcom equipment, the project includes:- > DLC rack and installation of cards like FXS, PRM, E1 and BRI will be installed by our engineers > FXS cables routed at MDF frame and kroned. > E1 cable routed at TX. rack and kroned. > Power cables routed and connected to DLC rack and power up the DLC. |
|||||||||||||||||
Alignment & Commissioning of linkhead LOS (Line of Sight Survey) The surveyors need to reach the site A where the survey has to be conducted and looks towards Site B for the Line Of Sight with the help of above said equipments. All the obstruction which are observed in the path are recorded and applied in to the Software of PATHLOSS to get determine the height with reference to AMSC (Average Mean Sea Level) of MW antenna and Azimuth be installed to get the LOS cleared. MW Antenna Installation TNMS ( Telecom Network Management Systems ) |
|||||||||||||||||
| Rack Installation | |||||||||||||||||
The rack for the installation of indoor unit and other equipment will be installed in the equipment room by grouting the bolts in the floor. The rods will be used if additional support is required. |
|||||||||||||||||
| Installation & Commissioning of Multiplexers in MSC, BSC and Cell Sites > Installing the mux in the rack and powering up from DC Distribution Box. > Installing The NVM (Non Volatile Memory) cards in the Mux. > Installing The DCDB in the rack. > Power tapping from rectifier to DCDB. > Installing the tributary cables from mux to Digital Distribution Frame. > Kroning the E1s in their respective krone modules (Tx, Rx). > Labeling the krone modules like TXs and RXs, and tributary cables. > Earthing the rack, and mux, from the earthing bar (less than 1 ohm) in the shelter. > Commissioning of mux. > Giving IP Address for DCC and Ethernet for management purpose. > Checking all kroned E1s with giving local loops from PC by using Bit Error Rate (BRR) Meter. > Checking mux Tx power of all out ports. > Checking the transmitting power of both the optical ports using power meter. > Checking mux receiving sensitivity of optical ports by using variable mechanical attenuator. |
|||||||||||||||||
|